Tikuna Park 3

Phase 3 of the Tikuna Park Solar Farm is a 119 MWp solar farm in the department of Cordoba, Colombia.

The project will be able to supply enough energy to power 112,000 average Colombian homes.*

*IADB: IDB-WP-1021 


Project Overview

  • Location
    Cordoba, Colombia
  • Carbon Offset
    163,196 Metric Tons
  • Power Plant
    119 MWp
  • Installation Type
    Ground Mount with tracking system
  • Annual Generation
    230,281 MWh
  • Project Owner                                                                       Efigen - Bosk Capital

Pre Engineering Concept: Tikuna Park 3 Solar Farm